Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658646

- Product Categories
- Friendly Links
- home > Supply > Taian flood control piledriver - Flood Control pneumatic hammers price, type% portable flood control equipment
Taian flood control piledriver - Flood Control pneumatic hammers price, type% portable flood control equipment
Information Name: | Taian flood control piledriver - Flood Control pneumatic hammers price, type% portable flood control equipment |
Published: | 2015-06-03 |
Validity: | 30 |
Specifications: | Negotiable |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Taian flood control piledriver - Flood Control pneumatic hammers price, type% portable flood control and flood control equipment Tai'an piledriver - flood control and pneumatic hammers price, type% portable flood control and flood control equipment Tai'an piledriver - flood control and pneumatic hammers price, type% Portable flood control equipment ☆ - Contact us: 132,3013,5357-- ☆ ☆ - Contact: Mo extraordinary - ☆ ☆ --- penguin buttoned: 2387,047,580 --- ☆ WX-DZF120 type Portable flood control applications piling machine: intercept embankment breach, breakwater berm, grab high dike, Qiang Hu embankment collapse, reinforcing the embankment. It is a novel devoted to flood the flood, before the flood season, after flood embankment reinforcement maintenance, rivers, lakes embankment piling machinery. Not only does it replace the current practices of human pounding, reduce labor intensity of human work to improve piling efficiency, and realize the flood control piling mechanization. By the majority of users actually use, generally reflect the product can meet the actual needs of flood prevention and rescue piling operations, to replace manpower pounding practices not only reduce labor intensity and improve work efficiency, the majority of users. WX-DZF120 portable piling machine: 1, before planting pile of work: (1) diesel fuel tank filled with diesel fuel, check the dipstick meets the requirements, before first use, instruction manual should add oil and diesel throttle placed in the idle state. (2) Check the rotating belt tension is appropriate. (3) Check all bolts and sturdy body. (4) whether the formation of the upper end of the steel pipe pile, steel pipe pile and pile head inserted into the top. (5) launched the diesel engine, the first to be idle for five minutes, are accelerated to the proper position of the fixed link accelerate. To the gas cylinder pressure reaches a predetermined pressure. (Factory before debugged) 2, pneumatic hammers work: (1) by a 2-3 hanging help the host operator collaborative framework and steel pipe pile, slightly down negative force operations. (2) When the pile has reached the implant depth, the operator can lift the host framework to stop work, so the method can be carried out continuously pile planting operation. (3) pile plant operation process, should pay attention to try to make the host and pile vertically to avoid deformation of the ends of the steel pipe pile stuck trailer coupling, consistent operating speed impact. (To be rated pump pressure pneumatic cylinder, exhaust valve automatically after piling work can begin planting, when faced with very hard soil or sand can use special steel drill bits in steel front end). WX-DZF120 portable flood control piling hammers == Technical parameters: Wx-175-type diesel pile driver flood control piling plant = LWH: (660 * 500 * 750) Host: LWH (450 * 350 * 450) Power Plant: Engine Type: 175R Rated power: 4.85KW clutch engagement speed: the total mass 1200r / min Power Plant: 73Kg formal structure: shock impact Frequency Modulation Maximum impact energy: 110.46N..M Weight: 74Kg shaft length: 4m Portable flood prevention pile plant operating parameters: the job object: river embankment Wu Tong (homogeneous soil) pile diameter: 60-120mm Length: 3000mm pile or greater speed: 500-1000mm / min Security matters: 1, is prohibited without a pile runaway ! 2, is strictly prohibited tossing, extrusion, collision! 3, do not for a long time immersed in the sewage. 4, do not for a long time into hot, humid environment. 5. pile planting process fails during use, immediately turn off the gas supply to stop using, inform professionals troubleshoot repairs. By the majority of users actually use, generally reflect the product can meet the actual needs of flood prevention and rescue piling operations, to replace manpower pounding practices not only reduce labor intensity and improve work efficiency, the majority of users. Taian flood control piledriver - Flood Control pneumatic hammers price, type% portable flood control and flood control equipment Tai'an piledriver - flood control and pneumatic hammers price, type% portable flood control and flood control equipment Tai'an piledriver - flood control and pneumatic hammers price, type% Portable flood control equipment |
Admin>>>
You are the 12970 visitor
Copyright © GuangDong ICP No. 10089450, Shijiazhuang holy work safety equipment sales Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12970 visitor
Copyright © GuangDong ICP No. 10089450, Shijiazhuang holy work safety equipment sales Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility