Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658646

- Product Categories
- Friendly Links
- home > Supply > Flood control around the well - Jinan assembled around the well parameters, price% quickly assemble high flood protection around well --1.3m
Flood control around the well - Jinan assembled around the well parameters, price% quickly assemble high flood protection around well --1.3m
Information Name: | Flood control around the well - Jinan assembled around the well parameters, price% quickly assemble high flood protection around well --1.3m |
Published: | 2015-06-17 |
Validity: | 30 |
Specifications: | Negotiable |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Flood control around the well - Jinan assembled around the well parameters, price% quickly assemble high flood control flood control Wai Wai Well Well --1.3m - Jinan assembled around the well parameters, price% quickly assemble high flood control flood control Wai Wai well --1.3m Well - Jinan assembled around the well parameters, price% rapid assembly of flood control around well --1.3m high ☆☆☆☆☆☆☆ Hebei Five Star Electric Equipment Co. ☆☆☆☆☆☆☆ business (pro ~ I wish you a happy life ) tick Hotline: 132-3013-5357 buttoned: 2387,0475,80 Department: Fire Department Contact: Mo extraordinary 1, fabricated - well construction and efficient flood control around 2, fabricated - flood control and rescue strength low around Wells 3, assembly - For flood control around the flexible shaft assembly 4, fabricated - flood protection around the well adaptability 5. Prefabricated - flood control and easy to transport around the wells 6, fabricated - reusable flood protection around the well assembled around the wells is mainly used for embankments and Qiang Hu piping dam damage danger. Its main role is to raise the water level at the levee piping orifice, reducing the water level of rivers water level difference and the hydraulic gradient (upstream) orifice and the piping, and inhibit further development dike piping failure. It can Qiang Hu single piping can also be group and Rescue piping. Fabricated mainly by means fence around the well, anchor, drainage and sealing system? Consisting of 4? Section. ? Well around piping dangerous size according to the actual situation and rescue requirements for assembly, generally piping orifice diameter of? 8 to 10? Times, surrounded by a drainage system the well depth adjustment. Unit fence is 4 × 40 GB angle iron, combined with steel mesh middle, surrounded by welded; specifications for the 1.0m × 1.2m, with four as a group, each with a drain, can be multiple sets of connection. The main role of anchor and fixing unit is connected fence for ф 21mm galvanized steel, each 1.5m (30 cm as piles). When the emergency construction of the pipe inserted into the unit around the connection hole board, and it is driven into the ground with a hammer to secure the surrounding wells. Drain tarps main drainage system on. The main role is to regulate the water level around the well. Around the well as the water level is too high, the open drain exclude excess water around the well, for raising the water level around the well, the outlet closed, so that the water level reached the proper height around the well, and then remained stable. Excess water should not be discharged in a combined circumference around the well should be discharged by connecting a hose to the appropriate location. Enclosed Well retaining tarps to 1.3m × 4.3m ~ 4.5m; can overlap assembled after 30cm-50cm, in order to prevent leakage; well anchor around 6 cm galvanized steel each 1.5m (30 cm for the piles ). The filter pad was 1.2m × 1.0m × 0.01m three-dimensional fiber mat; geotextile 1.0m × 0.9m × 0.001m of non-woven geotextile; grid of 1.0m × 2.0m plastic grid. ???? The product features: lightweight, practical, after use can be quickly recovered. Prefabricated flood control around wells Note: 1. should be stored in air-dry conditions. 2. around well after use should be cleaned, dried in the shade. 3. The failure to manual work resulting damage associated maintenance costs will be charged. 4. This product warranty period of one year, the useful life of three years. Flood control around the well - Jinan assembled around the well parameters, price% quickly assemble high flood control flood control Wai Wai Well Well --1.3m - Jinan assembled around the well parameters, price% quickly assemble high flood control flood control Wai Wai well --1.3m Well - Jinan assembled around the well parameters, price% quickly assemble high flood protection around well --1.3m |
Admin>>>
You are the 12970 visitor
Copyright © GuangDong ICP No. 10089450, Shijiazhuang holy work safety equipment sales Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12970 visitor
Copyright © GuangDong ICP No. 10089450, Shijiazhuang holy work safety equipment sales Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility