Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658646

- Product Categories
- Friendly Links
- home > Supply > Assembled around the well dimensions, prices - Governance piping around the flood control wells manufacturers + Storage
Assembled around the well dimensions, prices - Governance piping around the flood control wells manufacturers + Storage
Information Name: | Assembled around the well dimensions, prices - Governance piping around the flood control wells manufacturers + Storage |
Published: | 2015-06-17 |
Validity: | 30 |
Specifications: | Negotiable |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Assembled around the well dimensions, prices - Governance piping around the flood control wells manufacturers + Storage Dimensions assembled around the well, the price - Governance piping around the flood control wells manufacturers + Storage Dimensions assembled around the well, the price - Governance piping flood control around the wells manufacturers + Storage ☆ - Contact us: 132,3013,5357-- ☆ ☆ - Contact: Mo extraordinary - ☆ ☆ --- penguin buttoned: 2387,047,580 --- ☆ Flood Control Assembled around well is assembled from unit hoardings site is mainly used for the destruction and Rescue Piping danger, having Qiang Hu fast, effective and reusable, etc., for the State Flood Control and reserve materials. This achievement has been the national invention patents and utility model patents. In October 2002 identified by the achievement chaired by the Ministry of Water Resources. Appraisal committee that: The study results have innovative and advanced in technology and methods and Rescue levee piping failure to reach the international advanced level, with a wide range of application value. It can be used single Qiang Hu piping, piping and Rescue group in turn. A new, fast, cheap, environmentally friendly flood control equipment. Flood Control and assembled around the wells packaging and marking shall meet the following requirements: A, 10 units per panel as a group, a box of five, packaging with aluminum edging equipment boxes, packing smooth, firm, no damage, no stains, each package should be product certification and use manuals B, outside of each package should be printed white flag as follows: product name, type, size, quantity, weight, manufacturer, producer units, the production date. Fabricated mainly by means fence around the well, anchor, drainage and sealing system? Consisting of 4? Section. Compared with the traditional way to build around the well, combined (assembled) around the well in addition to simple installation, good effect, saving labor, can greatly increase the speed of the rescue, saving and rescue time and reduce the intensity of these rescue features, combined without the help of geomembrane leak-proof water, more lightweight, practical, easy recycling. ? Well around piping dangerous size according to the actual situation and rescue requirements for assembly, generally piping orifice diameter of? 8 to 10? Times, surrounded by a drainage system the well depth adjustment. Enclosed Well retaining tarps to 1.3m × 4.3m ~ 4.5m; can overlap assembled after 30cm-50cm, in order to prevent leakage; well anchor around 6 cm galvanized steel each 1.5m (30 cm for the piles ). The filter pad was 1.2m × 1.0m × 0.01m three-dimensional fiber mat; geotextile 1.0m × 0.9m × 0.001m of non-woven geotextile; grid of 1.0m × 2.0m plastic grid. ???? The product features: lightweight, practical, after use can be quickly recovered. The utility model relates to a hydraulic engineering equipment, especially the use of a flood and Rescue fabricated piping around the wells, the wells around the unit body structure, characterized in that: the unit body with a hoarding, hoarding is provided on both sides connector, the lower panels of a fixed member. The seams between panels are fixed water impermeable material. Hoardings settings control the well water drainage system. Wai is also provided with a metal reinforcement plate or non-metallic reinforcement. The present application provides flood and Rescue fabricated piping around the wells can be a very short time to build the piping outlet with a diameter of 6.4m required 20 panels, four assembly time of only 30 minutes, each hoarding weight 20kg, a person can carry. It also can be reused. This well may be assembled around the flood fight for valuable time, which can be used repeatedly, can reduce the cost of flood control equipment, convenient transportation and reserves, mechanical strength and stability, more reliable than the soil, sand and gravel. Assembled around the well dimensions, prices - Governance piping around the flood control wells manufacturers + Storage Dimensions assembled around the well, the price - Governance piping around the flood control wells manufacturers + Storage Dimensions assembled around the well, the price - Governance piping flood control around the wells manufacturers + Storage |
Admin>>>
You are the 12970 visitor
Copyright © GuangDong ICP No. 10089450, Shijiazhuang holy work safety equipment sales Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12970 visitor
Copyright © GuangDong ICP No. 10089450, Shijiazhuang holy work safety equipment sales Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility